Gemini 7 Patch
This Gemini 7 Patch is 3 inches in diameter and was produced by the official NASA patch manufacturer, AB Emblem. Gemini 7 was the fourth mission under the Gemini Program and launched on December 4, 1965.
In stock
DESCRIPTION
This Gemini 7 Patch is 3 inches in diameter and was produced by the official NASA patch manufacturer, AB Emblem. Gemini 7 was the fourth mission under the Gemini Program and launched on December 4, 1965. Command Pilot Frank Borman and Pilot Jim Lovell orbited the Earth 206 times over the course of 14 days in their Gemini spacecraft. Their Gemini spacecraft was targeted to be the first manned space rendezvous along with the crew of Gemini 6A. Both spacecraft came within 30cm of each other.
- Gemini 7 Patch
- Measures 3 Inches in Diameter
- Manufactured by AB Emblem
- Official NASA Patch
Description
This Gemini 7 Patch is 3 inches in diameter and was produced by the official NASA patch manufacturer, AB Emblem. Gemini 7 was the fourth mission under the Gemini Program and launched on December 4, 1965. Command Pilot Frank Borman and Pilot Jim Lovell orbited the Earth 206 times over the course of 14 days in their Gemini spacecraft. Their Gemini spacecraft was targeted to be the first manned space rendezvous along with the crew of Gemini 6A. Both spacecraft came within 30cm of each other.
- Gemini 7 Patch
- Measures 3 Inches in Diameter
- Manufactured by AB Emblem
- Official NASA Patch